01501cam 2200313 a 450000100070000000500170000708200240002424000330004824503150008124600590039630000550045550000190051050600800052958100160060965000650062565000660069065000610075665000620081765100290087971000360090871000370094471000230098171000420100471000270104671000440107371000240111771000300114199900160117120687320120518144903.004a338.9595223/KAL22110aKalaka-Saribas area, Sarawak10aIntegrated rural development projects for the Kalaka-Saribas area :bproposals for consultancy servicesfOctober 1982 /cSyed Muhammad Hooi dan Binnie Sdn. Bhd. and Perunding Utama in association with Snowy Mountains Engineering Corporation, Sime Darby Services, P.G. pak Poy & Associates (Malaysia) Sdn. Bhd.3 aIntegrated agricultural development feasibiliyty study avarious paging :bill. (some col.), maps ;c29 cm. aSPU Collection aLimited access, written permission is required from the State Planning Unit aUnpublished 0aAgricultural development projectszMalaysiazSarawakzKalaka 0aAgricultural development projectszMalaysiazSarawakzSaribas 0aEconomic development projectszMalaysiazSarawakzKalaka 0aEconomic development projectszMalaysiazSarawakzSaribas 0aSarawakxEconomic policy1 aSarawak.bUnit Perancang Negeri2 aRenardet Engineering - Scet Agri2 aTW dan Rakan-rakan2 aSyed Muhammad, Hooi and Binnie (Firm)2 aPerunding Utama (Firm)2 aSnowy Mountains Engineering Corporation2 aSime Darby Services2 aP.G. Pak Poy & Associates aSARAWAKIANA